Went over to the house to take a look at the progress after 2 weeks, and we were very pleased to see things moving. At the end of the 2nd week, these were completed:
a) Hacking works
b) Installation of door frame for the master bedroom door which we relocated
c) Electrical works
d) Kerbs for washing machine, fridge, kitchen cabinet and shower screen
e) Homogenous tiles (partial)
f) Installation of aircon
Some pictures!
White homogenous tiles for the living room
Our master bedroom after hacking away the wall in the middle
Washing machine platform
Aircon installed. For aircon, it was the guys from gain city who helped to install.
Stay tuned for more updates!