My Blog List

Sunday, June 22, 2014

Reno at 6th week

Reno at 6th week sees the following progress:

-Granite kitchen top installed
-Bathroom vanity wardrobe installed (basin and tap not yet)
-Lights installed (T5 and some of the light switches not done yet)

Yea, our kitchen cabinet is piano white in colour and granite top is piano black.
 
We tore down the basin provided by HDB and installed new ones. Wanted some storage space and got our ID to build a cabinet. Our ID upgraded our laminate door frame to an aluminum glass frame!
 
Dining lights, track lights, kitchen lights, downlights, toilet lights, service yard and store room lights installed. Ceiling fan too. But after the false ceiling, the ceiling fan felt so low. Have already shortened the height of the fan to its maximum leh. Must get used to the low ceiling in the new house.

2 comments: